> For the complete documentation index, see [llms.txt](https://docs.dietrichs.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://docs.dietrichs.com/dietrichs-intelligent-documentation/docs-de-en/holzrahmenbau-kompendium/prinzipien-des-hrb-systems/beziehungen-zwischen-bauteilen/standerlage.md).

# Stud Position

<figure><img src="/files/da37f620f6a17558ea085b33d5d8fba13f44837e" alt=""><figcaption></figcaption></figure>

For the positioning of certain components, relationships between the components are used. The classic post spacing of 0.625 m comes from halving the panel width of 1.25 m. Typically, a post should be located at every panel joint and one in between, which results in a spacing of 0.625 m. The posts are placed in exactly the same way:

* In the input of 2.3 *Stud layer* a reference sheathing is selected (see above: *4: OSB\_Layer:2*) and thereby a distribution stud is created at every joint of the OSB panel from layer 2.
* In addition, the number of field studs can be entered, in most cases one. In the example above this is done via a user variable. The field studs are distributed evenly between the distribution studs.

Contrary to the first versions of the HRB module, members can now reference a sheathing that in turn references another sheathing!
